1. Wiring sequence
When everything is ready, start wiring. According to the schematic diagram, the wiring of the main circuit should be completed first, and then the control circuit and signal circuit should be connected successively.
2. The feeding
When laying out the line must be according to the actual need to the length of the material, the movable wire harness should consider the maximum limit position required length, when laying out the line as far as possible to use short, zero line head, so as not to waste; Secondary wires are not allowed to have the middle joint, strong pulling wires and insulation, the condition of the damaged wire arrangement should try to reduce the bending and cross, when bending the bending radius should not less than three times the wire diameter, and bent into a curved, cross wire, should a few wires across multiple wire, fine wire across the thick wire for the principle; When wiring, each wire should be pulled straight, the line should be straight and tidy, and the style should be beautiful; When the wire passes through the metal plate hole, the metal plate hole must be covered with appropriate protection, such as rubber retainer; Guide XianShuYong flame retardant coil tube around, in order to reach a conductive heat dissipation requirements of each coil tube should be around a week 3 ~ 10 mm gap, at the same time can also be segmented, segmented coil spacing is 150 ~ 180 mm, winding length of 100 mm, piecewise winding wiring harness, subsection should also be neat, do not allow the uneven, walking wire should be in line groove.
3. Pressing of wiring head
Wire through the connection head and and external components, and then close the circuit breaker, check whether every all the way work is normal, only after all lines working properly can turn to the next working procedure, after the test, wiring slot cover and terminal cover shall be timely reset, air circuit breaker, and inside the electrical cabinet switch should be kept in the off state.