Nanpi Jian Tong Hardware Manufacturing Co., Ltd
+86-317-8851956

Introduce the installation of network cabinet

May 02, 2021

Once you have the relevant dimensions of the cabinet, check the shape of the equipment to make sure it matches the selected bracket. A sturdy cabinet can hold up to 450 pounds, so check the tools used to pull out the equipment, such as a door lift or a cart. A good cabinet has wheels under it, so you just need to put the equipment in there and push the cabinet to the right place.

Measure the size of the room and the ceiling, door and lift height through which the cabinet passes. Also, considering the various types of equipment in the cabinet, make sure that the cabinet is placed close to the power supply, cable jack, and communication jack.

Check the opening Angle of the cabinet door when opening and closing the cabinet. The standard cabinet door opens on the right and the door shaft is on the left, but the opposite is not excluded. All doors and side panels shall be easily opened for easy maintenance.

When you want to install equipment cabinets into an existing cabinet group, you can arrange the cabinets next to each other in a safe, neat row. Some cabinet groups due to various reasons, can not be added, or can only add a few accessories. The best cabinet model should be fully expandable with all the necessary hardware to remove the cabinet side panels and bolt the cabinets to each other in a row.